Search @ PMU
About
Admissions
Academics
Life @ PMU
Alumni
Resources
HR
Menu
Date Picking Elevator
Brainstorming
List of input to design date picking elevator:
The height of the palm tree.
Average radius and tree trunk.
Weight of the operator.
Materials used to build the elevator.
Target cost of elevator.
Safety requirements.
Target Weight of the elevator.
Lifting machine.
Speed.
Power needed.
Load time for operating.
Manufacturability.
Defined the problem statement.
Back
Problem Definition
Scope of Project
Abstract
Brainstorming
Initial Ideas
Final Design
Gantt Chart
Design Specification
Final Assembly
Stress Analysis
Conclusion
Explore PMU
Registration Office
Campus Life
Students
Academic Calendar
Alumni
LRC & Library